Plan a sign

Checklist

Before you install

Information only. The local points follow Dosquebradas’ rules; in another town, ask its alcaldía which rules apply.

  1. The sign goes on the building, with the owner’s consent if you rent.Ley 140 de 1994, art. 3
  2. Nothing stands on or hangs over the sidewalk, the front garden, a pole or a tree.Ley 140 de 1994, art. 3; POT de Dosquebradas (Acuerdo 007 de 2024), art. 284
  3. I asked the Secretaría de Gobierno whether the sign needs authorization before it is installed.Acuerdo 035 de 2025 (Dosquebradas), arts. 166-173
  4. If it is required, the sign is registered within 3 business days after installation.Acuerdo 035 de 2025 (Dosquebradas), art. 172; Ley 140 de 1994, art. 11
  5. The sign shows the owner’s name and phone, and the authorization number if there is one.Ley 140 de 1994, art. 9; Acuerdo 035 de 2025 (Dosquebradas), art. 171
  6. No piece covers an exit sign or narrows a door or escape route.NSR-10, K.3.2.3.3 and K.3.10.4
  7. If the building is heritage, the sign is flat and removable.POT de Dosquebradas (Acuerdo 007 de 2024), art. 197
  8. I know avisos y tableros is declared and paid with the ICA.Acuerdo 035 de 2025 (Dosquebradas), arts. 153-157

Ready when you are

Plan your sign in the browser

Measure the façade and the window, choose the pieces and see the area, the letter size, a price range and the dates. The planner writes the request; you send it on WhatsApp or by email and Creaciones Macadeho replies with the quote.

A phone beside a shopfront drawing